
POWERING THEGLOBAL AIREVOLUTION
A PIONEERINGAI INFRASTRUCTURECOMPANY
Neuronet Infrastructure Holding (NIH) is a pioneering AI infrastructure company focused on advancing the global artificial intelligence revolution. We specialize in investing, building, and operating state-of-the-art AI data centers across Asia, providing scalable and efficient compute power for next-generation AI applications.
The Infrastructure Behind AI
By leveraging strategic locations and cutting-edge technology, we empower businesses, researchers, and innovators to accelerate their AI ambitions. Our mission is to become the leading AI infrastructure provider, enabling a smarter and more connected future.
NEURONET INFRASTRUCTURE HOLDING · PART OF THE GNI GROUP
Long-term campus target
600 MW+ planned at KPGTP
Phase I IT load
Phase I development
Campus inside the SEZ
Kota Petra Green Technology Park
Phase I investment
Target RFS Q3 2027
Direct liquid cooling
No air-cooled data halls
Target annualised PUE
Global average 1.56
INVEST.BUILD.OPERATE.
Three disciplines, one platform. We take a site from capital allocation through construction to operation of AI-optimised capacity.
Capital into the right locations
We underwrite power, water, fibre and land before we underwrite buildings. Capital is deployed into jurisdictions where renewable generation, permitting and connectivity are already secured — not queued.
- Project equity and structured project finance
- Greenfield and brownfield site selection
- State-linked development partnerships
- Long-horizon campus master planning
AI-native design, not retrofits
Every hall is specified around the rack envelope it must carry: 140 kW to 250 kW, direct-to-chip liquid cooling, and the power train to match. We build to the platform generations that are shipping, not the ones that have been superseded.
- 100% direct-to-chip liquid cooling
- GB300 NVL72 and Vera Rubin NVL72 ready
- 132 kV Phase I, 275 kV Phase II supply
- Modular hall-by-hall delivery
Tropical operation, designed in
Equatorial heat, humidity and rainfall are design inputs, not exceptions. Cooling, water and flood defence are engineered for a site that sits outside the Pacific Ring of Fire and above the flood line.
- Warm-water DLC loops with N+1 CDUs
- Closed technical water loop, 70 MLD committed
- Critical-facility flood and drainage design
- Low seismicity, no typhoon exposure
ONE GROUP,THREE LAYERSOF INFRASTRUCTURE
Neuronet operates inside the GNI Group, which delivers integrated digital infrastructure across Asia-Pacific with operating roots in the Philippines, Vietnam, Malaysia and Singapore, and pipeline in Thailand and Indonesia.
GNI Asia
Tower sharing
PhilTower–MIDC JV in the Philippines (4,000+ towers) and 2,000+ towers across Vietnam and Malaysia.
Neuronet
AI data centres
AI/HPC-optimised data centres in Malaysia and Vietnam; flagship Neuronet Borneo in Sarawak.
Frontier NeoCloud
GPU cloud
NVIDIA Cloud Partner GPU cloud serving Southeast Asian compute markets, led by an ex-NVIDIA senior director.
USD 2B+ infrastructure commitment across towers, AI data centres and GPU cloud over the next five years.
THE PEOPLEBUILDING IT
Neuronet Borneo Sdn. Bhd. is governed by a board drawn from the joint-venture partners and run by an executive team spanning capital markets, project delivery and AI infrastructure engineering.
Board of directors
Dato Ir. Ts. Sudarnoto Osman
Board of Directors
Ts. Hamadlan Hj Hamdan
Board of Directors
Devid Gubiani
Board of Directors · Chairman
Raman Kavundar
Board of Directors · Advisor
Executive management
Devid Gubiani
Chairman
GNI Group founder; capital and strategy
Tan Ju Sern
Chief Executive Officer
Company leadership and delivery
Fritz Wang
Chief Commercial Officer
Commercial, offtake and partnerships
Siva Kumar
Head of Project Management
Phase I construction programme
Ruben Kamalaruben
Design & Engineering
Facility and liquid-cooling design
Henry Wang
Head of Investor Relations
Capital partners and reporting
NEURONETBORNEO
Neuronet Borneo Sdn. Bhd. is the sovereign AI infrastructure company — a joint venture between Neuronet Infrastructure Holdings and the Sarawak Digital Economy Corporation, incorporated in Sarawak in 2026. It is developing the KPGTP AI campus for a 100 MW Phase I IT load.
Neuronet Infrastructure Holdings
GNI Group
Equity and project finance, AI data centre design, NVIDIA ecosystem, GPU cloud and hyperscale offtake.
SDEC
Sarawak Digital Economy Corporation Berhad
State mandate and government relations, KPGTP facilitation, subsea landing and fibre, workforce pipeline.
Wholly owned by the Sarawak Government.
Neuronet Borneo Sdn. Bhd.
Sovereign AI infrastructure provider — developer and operator
- Asset
- KPGTP AI Campus, Kuching
- Trajectory
- Phase I 100 MW → 600 MW+ → 1 GW
2026 milestones
- —JV company incorporated in Sarawak
- —Board and management appointed
- —Phase I site works commence
GW-TIERKPGTP CAMPUS
A GW-tier AI data centre campus inside the Kota Petra Green Technology Park — a 3,000-acre Special Economic Zone seven kilometres from Kuching. Phase I delivers 100 MW of IT load in a 100% liquid-cooled facility, expandable to 1 GW on the same parcel.

- Campus
- 65.5 acres inside a 3,000-acre SEZ
- Phase I
- 100 MW IT load on ~20 acres
- Phase I investment
- USD 600 million
- Target RFS
- Q3 2027
- Cooling
- 100% direct-to-chip liquid, no air-cooled halls
- Rack envelope
- 140–250 kW per rack
- Power
- 100 MW IT-load Phase I · 132 kV dual circuit
- Water
- 70 MLD committed · connection Q2 2027
- Design standards
- Max 4 floors · 35% coverage · 65% green space


100 MW
- Footprint
- ~20 acres
- Supply
- 132 kV dual-circuit substation
- Design
- 100% direct liquid cooling
- Platforms
- GB300 NVL72 / Vera Rubin NVL72 ready
- Investment
- USD 600M
- Target RFS
- Q3 2027
500 MW
- Footprint
- ~45 acres
- Supply
- 275 kV transmission substation
- Design
- 100% liquid cooling
- Platforms
- Next-generation NVIDIA rack platforms
- Delivery
- Modular hall-by-hall, demand-led phasing
1 GW
- Campus target
- 600 MW+ planned across 65.5 acres
- Power
- Hydro-dominant grid + KPGTP solar and BESS
- Gateway
- SEA-H2X / BaSICS subsea systems
- Tenants
- Sovereign and hyperscale
- Position
- Regional AI hub for Borneo
POWER, WATERAND THESUBMARINE EDGE
The three constraints that decide where AI capacity can actually be built — secured at KPGTP.
- State grid
- ~5.9 GW installed, ~3.6 GW hydro; 10 GW target by 2030
- Phase I
- 100 MW IT load
- Phase I supply
- 132 kV dual circuit
- Phase II
- 275 kV transmission substation for 500 MW
- Park generation
- 300 MW solar farm + 600 MWh BESS
Hydro-dominant supply, among Malaysia's most competitive tariffs, with no dependency on Peninsular grid constraints.
- Committed supply
- 70 MLD; connection Q2 2027
- Architecture
- Warm-water DLC loops via in-row CDUs to every NVL72 rack
- Redundancy
- N+1 CDUs and dual loops for concurrent maintainability
- Target PUE
- 1.2–1.3 (global average 1.56, Uptime Institute 2024)
- Climate
- Equatorial 26–32 °C; outside the Ring of Fire, no typhoon exposure
- Local fibre
- SDEC CLS Santubong → campus, ~23 km dual diverse paths
- BaSICS
- Kuching–Batam, 48 Tbps; in service since 2022
- SEA-H2X
- 8 fibre pairs · 20 Tbps per pair; S5 branch to Kuching (SDEC)
- ICE II
- MoU with Telin and ITCO Niaga for an additional Kuching landing
- Latency
- <9 ms to Singapore with full legal separation
- NVIDIA GB300 NVL72
- 72 GPUs + 36 Grace CPUs per rack · ~130–140 kW · DLC
- NVIDIA Vera Rubin NVL72
- 72 Rubin GPUs + 36 Vera CPUs per rack · 200 kW+ class · DLC
- Indicative Phase I (GB300)
- ~700 racks · ~50,000 GPUs
- Indicative Phase I (Vera Rubin)
- ~450 racks · ~32,000 GPUs
- Facility basis
- 100% DLC · 140–250 kW racks · 132 kV · ≤4 floors · piled
FROM TOWERSTO AGW-TIER CAMPUS
The group's progression from shared infrastructure into sovereign AI capacity.
Tower sharing
PhilTower–MIDC joint venture established; GNI Asia operates 2,000+ towers across Malaysia and Vietnam.
Data centre platform
Neuronet Holdings launched. On 19 November, the Strategic Collaboration Agreement with SDEC, PHB and Zecon for KPGTP is signed in Kuching.
GPU cloud
NVIDIA Cloud Partner GPU cloud live in Malaysia, with an enterprise inference deployment in Kuching.
Neuronet Borneo joint venture
NIH × SDEC joint venture incorporated in Sarawak; Phase I works commence.
Phase I ready for service
100 MW liquid-cooled AI campus handed over, targeting Q3 2027.
Scale-up
Phase II of 500 MW on 275 kV transmission, moving toward the 1 GW campus target.
LET'S BUILDTOGETHER
For capital partnerships, site briefings, offtake and supply-chain enquiries, contact the corporate team in Singapore or the project office in Kuching.
Helpful to include
- —Required IT load and target energisation date
- —Cooling and rack density assumptions
- —Connectivity, latency and sovereignty requirements
- —Preferred commercial structure
Corporate office
36 Robinson Road, #13-01 City House, Singapore
Project office
Kuching, Sarawak, Malaysia