Neuronet
GW-tier campus · Kuching, Sarawak

POWERING THEGLOBAL AIREVOLUTION

100 MW Phase I1 GW campus targetRFS Q3 2027
CONCEPT VISUALISATION · NOT A SURVEY DRAWING
SINGAPORE/MALAYSIA/VIETNAM/PHILIPPINES/THAILAND/INDONESIA/SARAWAK/BORNEO/
SINGAPORE/MALAYSIA/VIETNAM/PHILIPPINES/THAILAND/INDONESIA/SARAWAK/BORNEO/
Corporate overview

A PIONEERINGAI INFRASTRUCTURECOMPANY

Neuronet Infrastructure Holding (NIH) is a pioneering AI infrastructure company focused on advancing the global artificial intelligence revolution. We specialize in investing, building, and operating state-of-the-art AI data centers across Asia, providing scalable and efficient compute power for next-generation AI applications.

Mission

The Infrastructure Behind AI

By leveraging strategic locations and cutting-edge technology, we empower businesses, researchers, and innovators to accelerate their AI ambitions. Our mission is to become the leading AI infrastructure provider, enabling a smarter and more connected future.

NEURONET INFRASTRUCTURE HOLDING · PART OF THE GNI GROUP

1GW

Long-term campus target

600 MW+ planned at KPGTP

100MW

Phase I IT load

Phase I development

65.5ac

Campus inside the SEZ

Kota Petra Green Technology Park

USD 600M

Phase I investment

Target RFS Q3 2027

100%

Direct liquid cooling

No air-cooled data halls

1.2–1.3PUE

Target annualised PUE

Global average 1.56

What we do

INVEST.BUILD.OPERATE.

Three disciplines, one platform. We take a site from capital allocation through construction to operation of AI-optimised capacity.

01 · Invest

Capital into the right locations

We underwrite power, water, fibre and land before we underwrite buildings. Capital is deployed into jurisdictions where renewable generation, permitting and connectivity are already secured — not queued.

  • Project equity and structured project finance
  • Greenfield and brownfield site selection
  • State-linked development partnerships
  • Long-horizon campus master planning
02 · Build

AI-native design, not retrofits

Every hall is specified around the rack envelope it must carry: 140 kW to 250 kW, direct-to-chip liquid cooling, and the power train to match. We build to the platform generations that are shipping, not the ones that have been superseded.

  • 100% direct-to-chip liquid cooling
  • GB300 NVL72 and Vera Rubin NVL72 ready
  • 132 kV Phase I, 275 kV Phase II supply
  • Modular hall-by-hall delivery
03 · Operate

Tropical operation, designed in

Equatorial heat, humidity and rainfall are design inputs, not exceptions. Cooling, water and flood defence are engineered for a site that sits outside the Pacific Ring of Fire and above the flood line.

  • Warm-water DLC loops with N+1 CDUs
  • Closed technical water loop, 70 MLD committed
  • Critical-facility flood and drainage design
  • Low seismicity, no typhoon exposure
GNI Group

ONE GROUP,THREE LAYERSOF INFRASTRUCTURE

Neuronet operates inside the GNI Group, which delivers integrated digital infrastructure across Asia-Pacific with operating roots in the Philippines, Vietnam, Malaysia and Singapore, and pipeline in Thailand and Indonesia.

GNI Asia

Tower sharing

PhilTower–MIDC JV in the Philippines (4,000+ towers) and 2,000+ towers across Vietnam and Malaysia.

Neuronet

AI data centres

AI/HPC-optimised data centres in Malaysia and Vietnam; flagship Neuronet Borneo in Sarawak.

Frontier NeoCloud

GPU cloud

NVIDIA Cloud Partner GPU cloud serving Southeast Asian compute markets, led by an ex-NVIDIA senior director.

USD 2B+ infrastructure commitment across towers, AI data centres and GPU cloud over the next five years.

Leadership

THE PEOPLEBUILDING IT

Neuronet Borneo Sdn. Bhd. is governed by a board drawn from the joint-venture partners and run by an executive team spanning capital markets, project delivery and AI infrastructure engineering.

Board of directors

Dato Ir. Ts. Sudarnoto Osman

Board of Directors

Ts. Hamadlan Hj Hamdan

Board of Directors

Devid Gubiani

Board of Directors · Chairman

Raman Kavundar

Board of Directors · Advisor

Executive management

Devid Gubiani

Chairman

GNI Group founder; capital and strategy

Tan Ju Sern

Chief Executive Officer

Company leadership and delivery

Fritz Wang

Chief Commercial Officer

Commercial, offtake and partnerships

Siva Kumar

Head of Project Management

Phase I construction programme

Ruben Kamalaruben

Design & Engineering

Facility and liquid-cooling design

Henry Wang

Head of Investor Relations

Capital partners and reporting

Project company

NEURONETBORNEO

Neuronet Borneo Sdn. Bhd. is the sovereign AI infrastructure company — a joint venture between Neuronet Infrastructure Holdings and the Sarawak Digital Economy Corporation, incorporated in Sarawak in 2026. It is developing the KPGTP AI campus for a 100 MW Phase I IT load.

Joint venture

Neuronet Infrastructure Holdings

GNI Group

Equity and project finance, AI data centre design, NVIDIA ecosystem, GPU cloud and hyperscale offtake.

SDEC

Sarawak Digital Economy Corporation Berhad

State mandate and government relations, KPGTP facilitation, subsea landing and fibre, workforce pipeline.

Wholly owned by the Sarawak Government.

The vehicle

Neuronet Borneo Sdn. Bhd.

Sovereign AI infrastructure provider — developer and operator

Asset
KPGTP AI Campus, Kuching
Trajectory
Phase I 100 MW → 600 MW+ → 1 GW

2026 milestones

  • —JV company incorporated in Sarawak
  • —Board and management appointed
  • —Phase I site works commence
Flagship project

GW-TIERKPGTP CAMPUS

A GW-tier AI data centre campus inside the Kota Petra Green Technology Park — a 3,000-acre Special Economic Zone seven kilometres from Kuching. Phase I delivers 100 MW of IT load in a 100% liquid-cooled facility, expandable to 1 GW on the same parcel.

Masterplan indication for the Kota Petra Green Technology Park
MASTERPLAN INDICATION OF THE 3,000-ACRE PARK · DEVELOPER DRAWING · THE CAMPUS OCCUPIES 65.5 ACRES WITHIN IT
At a glance
Campus
65.5 acres inside a 3,000-acre SEZ
Phase I
100 MW IT load on ~20 acres
Phase I investment
USD 600 million
Target RFS
Q3 2027
Cooling
100% direct-to-chip liquid, no air-cooled halls
Rack envelope
140–250 kW per rack
Power
100 MW IT-load Phase I · 132 kV dual circuit
Water
70 MLD committed · connection Q2 2027
Design standards
Max 4 floors · 35% coverage · 65% green space
Campus concept visualisation
CAMPUS CONCEPT · LOW-RISE, SOLAR-ROOFED, 65% GREEN SPACE
Liquid-cooled data hall visualisation
100% DIRECT-TO-CHIP LIQUID COOLING · 140–250 KW RACKS
Phase I · 2026–2027

100 MW

Footprint
~20 acres
Supply
132 kV dual-circuit substation
Design
100% direct liquid cooling
Platforms
GB300 NVL72 / Vera Rubin NVL72 ready
Investment
USD 600M
Target RFS
Q3 2027
Phase II · est. 2029

500 MW

Footprint
~45 acres
Supply
275 kV transmission substation
Design
100% liquid cooling
Platforms
Next-generation NVIDIA rack platforms
Delivery
Modular hall-by-hall, demand-led phasing
Long term

1 GW

Campus target
600 MW+ planned across 65.5 acres
Power
Hydro-dominant grid + KPGTP solar and BESS
Gateway
SEA-H2X / BaSICS subsea systems
Tenants
Sovereign and hyperscale
Position
Regional AI hub for Borneo
Engineering position

POWER, WATERAND THESUBMARINE EDGE

The three constraints that decide where AI capacity can actually be built — secured at KPGTP.

Power
State grid
~5.9 GW installed, ~3.6 GW hydro; 10 GW target by 2030
Phase I
100 MW IT load
Phase I supply
132 kV dual circuit
Phase II
275 kV transmission substation for 500 MW
Park generation
300 MW solar farm + 600 MWh BESS

Hydro-dominant supply, among Malaysia's most competitive tariffs, with no dependency on Peninsular grid constraints.

Water & cooling
Committed supply
70 MLD; connection Q2 2027
Architecture
Warm-water DLC loops via in-row CDUs to every NVL72 rack
Redundancy
N+1 CDUs and dual loops for concurrent maintainability
Target PUE
1.2–1.3 (global average 1.56, Uptime Institute 2024)
Climate
Equatorial 26–32 °C; outside the Ring of Fire, no typhoon exposure
Connectivity
Local fibre
SDEC CLS Santubong → campus, ~23 km dual diverse paths
BaSICS
Kuching–Batam, 48 Tbps; in service since 2022
SEA-H2X
8 fibre pairs · 20 Tbps per pair; S5 branch to Kuching (SDEC)
ICE II
MoU with Telin and ITCO Niaga for an additional Kuching landing
Latency
<9 ms to Singapore with full legal separation
AI infrastructure specification
NVIDIA GB300 NVL72
72 GPUs + 36 Grace CPUs per rack · ~130–140 kW · DLC
NVIDIA Vera Rubin NVL72
72 Rubin GPUs + 36 Vera CPUs per rack · 200 kW+ class · DLC
Indicative Phase I (GB300)
~700 racks · ~50,000 GPUs
Indicative Phase I (Vera Rubin)
~450 racks · ~32,000 GPUs
Facility basis
100% DLC · 140–250 kW racks · 132 kV · ≤4 floors · piled
Delivery enablers
Land65.5-acre allocation in the KPGTP SEZ; landowner Zecon is an SCA partnerSecured
Power100 MW IT-load Phase I; 132 kV dual circuitIn progress
Water70 MLD committed; connection Q2 2027Secured
Ground & designSoil investigation complete (11 boreholes); ~30 m PHC pile design basisSecured
ConnectivitySDEC fibre CLS → campus; BaSICS live; SEA-H2X S5 branchIn progress
PermitsEIA and building approvals via SEZ and state authoritiesIn progress
Track record

FROM TOWERSTO AGW-TIER CAMPUS

The group's progression from shared infrastructure into sovereign AI capacity.

2019

Tower sharing

PhilTower–MIDC joint venture established; GNI Asia operates 2,000+ towers across Malaysia and Vietnam.

2024

Data centre platform

Neuronet Holdings launched. On 19 November, the Strategic Collaboration Agreement with SDEC, PHB and Zecon for KPGTP is signed in Kuching.

2025

GPU cloud

NVIDIA Cloud Partner GPU cloud live in Malaysia, with an enterprise inference deployment in Kuching.

2026

Neuronet Borneo joint venture

NIH × SDEC joint venture incorporated in Sarawak; Phase I works commence.

2027

Phase I ready for service

100 MW liquid-cooled AI campus handed over, targeting Q3 2027.

2029+

Scale-up

Phase II of 500 MW on 275 kV transmission, moving toward the 1 GW campus target.

Contact

LET'S BUILDTOGETHER

For capital partnerships, site briefings, offtake and supply-chain enquiries, contact the corporate team in Singapore or the project office in Kuching.

Helpful to include

  • —Required IT load and target energisation date
  • —Cooling and rack density assumptions
  • —Connectivity, latency and sovereignty requirements
  • —Preferred commercial structure

Corporate office

36 Robinson Road, #13-01 City House, Singapore

Project office

Kuching, Sarawak, Malaysia